Road Work means detour for some

Rochester Road will be shut down between Sloop Road and King William Drive for about two months starting August 24. This section of Rochester Road is south of SJN, so if you normally turn 'right' into our parking lot, you are likely affected. Detours are Reis Run Road, or Sloop/Willoughby/Harmony/Ingomar.

If you normally come to SJN from the North (turn left into the lot), then don't be fooled by road closure signs - they say: LOCAL TRAFFIC ONLY, but St. John Neumann is reachable from there. Details about the project can be found at https://www.townofmccandless.org/home/news/part-rochester-road-be-shut-down-2-months


St. John Neumann Parish  •  2230 Rochester Road, Pittsburgh, PA 15237  •  info@sjnpittsburgh.org  •  412-366-5885

 Office Hours: Mon - Fri: 9am-4pm

©2020 by ST. JOHN NEUMANN PARISH

  • Facebook
  • Instagram
  • Twitter
  • YouTube
  • icons8-email-24